loader image

Universal Engineering

Timing

Mon - Fri 9:00AM - 5:00PM Sun - CLOSED

Stay Connected :

Park Ridge Golf Course Project Solid Waste Authority

Analyzed data collected for the groundwater and surface water level monitoring Solid Waste Authority Park Ridge golf course project. Performed a technical review of the ground water model developed for Solid Waste Authority SWA NCRRF and Dyer Park Sites.

Metal Contamination Study of the Rio Lator River

Study the effect of metal-rich drainage from an old abandoned chemical company. Conducted field sample collection of water and sediments. Analyzed collected samples and determine potential effect of contaminants transport.

Model Simulation of Persistent Biocaccumulative Toxic Organic
and Inorganic pollutants

Developed a multi-phase exchange reactive transport model to simulate the fate and transport of organic and inorganic pollutants from contaminated streambed sediments and the biouptake of organic pollutants by benthic organisms. Applied processes like sorption/desorption, chemical precipitation, darcys law, advection/dispersion, among others.

Need Estimate?

For more detail contact us.

Request Estimate

X